{"id":3,"date":"2019-12-20T11:39:38","date_gmt":"2019-12-20T20:39:38","guid":{"rendered":"https:\/\/multisite.crweng.com\/32nd-33rd-upgrades\/home\/"},"modified":"2025-01-27T15:18:55","modified_gmt":"2025-01-28T00:18:55","slug":"home","status":"publish","type":"page","link":"https:\/\/loisdrivereconstruction.com\/","title":{"rendered":"Lois Drive Reconstruction Project"},"content":{"rendered":"\n
The Municipality of Anchorage (MOA) is planning to upgrade Lois Drive (from West 32nd Avenue to Benson Boulevard). Previously the project included West 32nd Avenue (from Lois Drive to Minnesota Drive), this portion of the project has transitioned to an Anchorage Metropolitan Area Transportation Program (AMATS) funded project. See map below for updated project limits, A Design Study Report Update Memo has been released summarizing the changes from the original project and can be found in Documents & Resources<\/a> page. This project is a priority for the Spenard Community Council, surrounding facilities, and the adjacent multi-family and residential neighborhoods.<\/p>\n\n\n\n Improvements include:<\/p>\n\n\n\n The MOA has contracted with CRW Engineering Group, Inc. to provide preliminary engineering and design services. The project is funded through the design phase through local road bonds, additional funding will be necessary for construction. The earliest that construction is likely to occur will be in 2026.<\/p>\n\n\n\n How to get involved:<\/strong><\/p>\n\n\n\n UPCOMING MEETINGS<\/strong> PROJECT INFORMATION<\/strong><\/p>\n\n\n\n May 2024<\/strong> April 2024\n
\n
Recent Project News<\/h3>\n\n\n\n
No meetings scheduled at this time.<\/p>\n\n\n\n
Project Fact Sheet<\/a><\/p>\n\n\n\n
<\/strong>Design Study Report Update Memo<\/a><\/p>\n\n\n\n